Difference between revisions of "Francis S. Levien Gymnasium"

From WikiCU
Jump to: navigation, search
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
[[Image:Levien.jpg|thumb|240px|Francis S. Levien Gymnasium]]
 
[[Image:Levien.jpg|thumb|240px|Francis S. Levien Gymnasium]]
The '''Francis S. Levien Gymnasium''', sometimes referred to as "The Levien Underground" by [[WKCR]] sportscasters, opened at the start of the [[1974]] season, replacing the [[University Gym]], which continues to serve as an intramural facility. Levien draws a loud crowd in support of [[Men's Basketball]]. Women's Basketball and Volleyball games tend not to draw as large a crowd.
+
The '''Francis S. Levien Gymnasium''', sometimes referred to as "The Levien Underground" by [[WKCR]] sportscasters, opened at the start of the [[1974]] season, replacing the [[University Gym]], which continues to serve as an intramural facility. Levien draws a loud crowd in support of [[Men's Basketball]]. [[Women's Basketball]] and [[Volleyball]] games tend not to draw as large a crowd.
  
 
The gym is open for recreational basketball and other sports during times that it isn't scheduled for games, practices, classes, or other events.
 
The gym is open for recreational basketball and other sports during times that it isn't scheduled for games, practices, classes, or other events.
  
The west bleacher's features the [[Lion's Den]] student section.
+
The west bleachers features the [[Lion's Den]] student section.
  
 
Levien Gym is the site of the annual [[Basketball Mania]] season kick-off event.
 
Levien Gym is the site of the annual [[Basketball Mania]] season kick-off event.
  
In the summer of 2002, a brand new state-of-the-art floor was built that provides better spring and cushion for Columbia's student-athletes. The project, a cooperative effort between Columbia University's department of facility management and its department of physical education and intercollegiate athletics, cost nearly $1 million. The improvements include a custom floor created by J.J. Curran of Connor Flooring Systems. The custom floor features 1.5-inch boards, different from the normal 2.25-inch boards. The thinner, more tightly-packed boards provide more stability for the surface.
+
In the summer of 2002, a brand new state-of-the-art floor was built that provides better spring and cushion for Columbia's student-athletes. The project, a cooperative effort between Columbia University's [[Facilities|Department of Facility Management]] and its department of physical education and intercollegiate athletics, cost nearly $1 million. The improvements include a custom floor created by J.J. Curran of Connor Flooring Systems. The custom floor features 1.5-inch boards, different from the normal 2.25-inch boards. The thinner, more tightly-packed boards provide more stability for the surface.
  
 
Levien Gym also underwent a major upgrade over the summer of [[2004]] to improve its seating and now offers chairback seats in addition to bleacher-style seating.   
 
Levien Gym also underwent a major upgrade over the summer of [[2004]] to improve its seating and now offers chairback seats in addition to bleacher-style seating.   
Line 16: Line 16:
  
 
[[Category:Athletics facilities]]
 
[[Category:Athletics facilities]]
 +
[[Category:Morningside Heights campus]]
 +
[[Category:Gyms]]

Latest revision as of 02:14, 22 November 2012

Francis S. Levien Gymnasium

The Francis S. Levien Gymnasium, sometimes referred to as "The Levien Underground" by WKCR sportscasters, opened at the start of the 1974 season, replacing the University Gym, which continues to serve as an intramural facility. Levien draws a loud crowd in support of Men's Basketball. Women's Basketball and Volleyball games tend not to draw as large a crowd.

The gym is open for recreational basketball and other sports during times that it isn't scheduled for games, practices, classes, or other events.

The west bleachers features the Lion's Den student section.

Levien Gym is the site of the annual Basketball Mania season kick-off event.

In the summer of 2002, a brand new state-of-the-art floor was built that provides better spring and cushion for Columbia's student-athletes. The project, a cooperative effort between Columbia University's Department of Facility Management and its department of physical education and intercollegiate athletics, cost nearly $1 million. The improvements include a custom floor created by J.J. Curran of Connor Flooring Systems. The custom floor features 1.5-inch boards, different from the normal 2.25-inch boards. The thinner, more tightly-packed boards provide more stability for the surface.

Levien Gym also underwent a major upgrade over the summer of 2004 to improve its seating and now offers chairback seats in addition to bleacher-style seating.

External Links

Levien Gym Schedule for the current week